Update from DTE:
DTE will replace any sidewalk flags that are damaged during the construction process. These are typically captured during our property restoration pre-walk process after the construction work is completed.
The residents do not have to report these. But, they should report any tripping hazards. Residents can contact us at 313-270-9240.
As far as timing goes, property restoration season is May – November, weather permitting. Repairs needed from construction done during non-restoration season will be completed by June 30, again, as weather permits. #DTEgasrenewal